 | | Project: | Anjulita Court Care Home | | System: | REHAU RAUTHERM Polymer Pipework, REHAU Underfloor eating System | | City: | Bedford | | Requirement: | A heating & plumbing system throughout the 62-bedroomed care home, and Underfloor heating on the ground floor | | Solution: | REHAU’s RAUTHERM universal cross-linked polyethylene pipework for the project because it could meet the performance specification and, thanks to its flexibility, could be installed in around 25% of the time required for the copper alternative. | | Advantage REHAU System: | A key benefit in using the REHAU pipework was REHAU’s EVERLOC compression sleeve jointing system which provides a permanent, leak free joint fully warrantied for 10 years |
|